The scheme started out as a simple reinstatement following a small fire, however, various issues on a project of this type typically require negotiation with the loss adjudicator, such as the extent of damage and the need to comply with current legislative guidance in respect of the reinstatement either of which can lead to differing interpretations of betterment.
Following a change in protocols the storage facility was no longer required and the designs were amended to house an IT support team.
New IT Server Facility
Due to a reconfiguration of services and property ownerships a need arose for a new facility to be provided on a long term site. The building is a simple IT Facility, however it has to incorporate basic accessible welfare facilities to meet legal workplace regulations.
Reconfiguration of existing Office Facilities
This work, to a building that we designed nearly 20 years ago is required in a tight timeframe and incorporates numerous phases of work in order to retain occupation of the premises throughout.
Refurbishment of Broad Street Centre
The refurbishment of this facility incorporatesmainly the provision of office accommodaiton, but the works also incorporate specialist works to prevent further damage from damp to this Grade 2 listed building.
External Works Highbury Hospital
A Landscaping scheme to the Horizon Day Centre on the Highbury Hospital site to provide a new sensory area for the facility.